|
MenuHOME
|
Part 2 :- Engine wiring & remaining build SECTION 3 :- spark plugs & pulleys In stage 6 I painted the spark plugs white, then glued them in position first as this will aid the wiring process. With keeping with the colour scheme the pulleys & rocker covers were sanded, painted with either gold for the "Corvair" or "Forest green" for the dragontrike. I then glued on the top pulley & all the other pulleys, as well as the distributor cap & painted rocker covers. SECTION 2 :- Distributor cap wiring & prep The easiest way I found of wiring the trikes was to do the following, but as expected problems did arise. I cut the plastic tubing as in stage 6
but allowed an extra 1cm for the tubing to bend. To resolve this I did the following. I drilled out where the snapped peg was with a 1mm drill bit. I then cut a 1cm piece of 1mm diameter wire out of my spares box & super glued this into the hole & allowed it to set. I then cut another length of tubing & then glued this onto the wire.
SECTION 4 :- Distributor cap wiring & prep Before fitting the wiring into the spark plugs I fitted the cross beam & front tubing. As the wires have to go across the engine I also put on the drive belt, fuel line fixing frame. Now comes the time to be very careful & gently put each line onto the spark plugs. I found it better to follow this sequence 6/5/4/3/2/1 to connect the tubes.
COMING NEXT:- From here the models will now split as the builds will be different so just follow the one you need.
|